2005年-世界发展银行全球_Capacity_Building_in_Africa___An_OED_Evaluation_of_World_Bank_Support_114页_1mb
报告摘要
Capacity Building in Africa: An OED Evaluation of World Bank Support
Core Content
This report is an evaluation by the World Bank's Operations Evaluation Department (OED) of the Bank's support for public sector capacity building in Africa between 1995 and 2004. It outlines the findings and recommendations to enhance the effectiveness of such support.
Main Goals and Objectives
The primary objective of the evaluation is to assess the relevance and effectiveness of the World Bank's capacity building interventions in the public sector across African countries. The evaluation emphasizes the need for country-owned, results-oriented, and evidence-based approaches to capacity building.
Key Findings
1. Recent changes in approach have made Bank support more relevant
- The Bank has broadened its support to include strengthening of public institutions and fostering demand for public service improvements.
- New diagnostic tools have been introduced to assess public financial management capacities.
- The Bank has increased the range of lending instruments to promote country ownership.
- Corporate and Regional programs have been expanded to directly support capacity building.
2. Most capacity support remains fragmented
- Capacity building is often embedded in other program components and not clearly specified as an objective.
- Many activities lack adequate needs assessments and proper sequencing of measures.
- There is a lack of standard quality assurance processes at the design stage.
3. Sector-specific capacity building approaches need strengthening
- Challenges vary across sectors and countries due to differing priorities and institutional contexts.
- The Bank has not fully derived lessons along sectoral dimensions or fostered country-led planning within sector programs.
4. Tools and instruments could be more effectively and fully utilized
- Traditional tools like technical assistance and training have had limited impact on building sustainable public sector capacity.
- Programmatic lending has been used more effectively for strategic planning than for building sustainable capacity.
- The World Bank Institute (WBI) has not fully transformed from individual training to capacity building.
5. Quality assurance is inadequate
- The Bank does not apply the same rigorous business practices to capacity building as it does in other areas.
- Most activities lack systematic monitoring, tracking, and evaluation.
Key Recommendations
1. Strengthen the Bank’s knowledge base and framework for public sector capacity building
- Develop a comprehensive knowledge base to support capacity building.
- Create a framework that helps countries prioritize capacity building activities and guide donor support.
- Ensure self- and independent evaluation of capacity building interventions.
2. Develop sector-specific guidance for diagnosing and monitoring capacity building
- Sector and thematic leadership should develop guidance for diagnosing public sector capacity needs.
- Provide ways to monitor and evaluate interventions effectively within each sector.
3. Ensure effective use of Country Assistance Strategies (CASs)
- Regional senior management should ensure that CASs are used to identify and strengthen the capacities needed for poverty reduction strategies.
- All operations aiming to build public sector capacity should be based on adequate needs assessments and have robust monitoring and evaluation mechanisms.
4. Reassess the role of training in capacity building
- The Bank should reassess how training should be integrated into its capacity building support.
- Clarify the roles of a central training unit and Regional programs in future support.
Corporate and Regional Mechanisms
The World Bank Institute (WBI)
- Provides training, knowledge, and advisory services to public sector officials.
- Has shifted from individual training to capacity building, but the transformation is not yet complete.
- Has introduced country-level capacity needs assessments and strategies, but lacks pedagogic tools for its new role.
The African Capacity Building Foundation (ACBF)
- An independent institution that provides grants to support economic policy analysis and development management.
- Has the potential to support a wide range of activities, not limited to technical assistance and training.
- Lacks a clear link between its ad hoc programs and country-specific needs.
- Needs well-defined outcome measures to monitor its accomplishments.
The Institutional Development Fund (IDF)
- A program that provides grants to governments for small-scale capacity building.
- Has the potential to complement other initiatives, but its impact is limited due to lack of integration and coherence.
Conclusion
While the World Bank has made progress in making its capacity building support more relevant and aligned with country priorities, it still faces significant challenges in terms of coherence, effectiveness, and quality assurance. The report calls for a more systematic, evidence-based, and country-led approach to capacity building in the public sector across Africa.
试读结束,高清完整版pdf/doc/ppt,请点下载