20240314-IMF-The_ECB_s_Future_Monetary_Policy_Operational_Framework_Corridor_or_Floor_40页_1mb
报告摘要
The ECB’s Future Monetary Policy Operational Framework: Corridor or Floor?
Key Points:
-
Current Situation:
Before the GFC, the ECB used a corridor system, which was followed by an intermediate system and then a floor system since 2015. The floor system involves abundant reserves and bounding the overnight rate using a deposit facility. -
Framework Comparison:
- Corridor System: Narrower central bank balance sheets, promotes interbank market activity and tighter bank liquidity management. Requires frequent market operations to maintain the policy rate.
- Floor System: Bounded from below by deposit facility, reduces liquidity shortages risk and offers precise control but may suppress interbank activity and increase central bank balance size.
-
Parsimonious Floor:
The optimal framework is a hybrid of a "parsimonious floor" with minimal reserves and a "zero or near-zero corridor" (lending facility priced near the deposit rate). This reduces excess reserves, encourages better bank liquidity management, and stabilizes liquidity conditions. -
Transition Considerations:
The ECB will likely maintain the floor system during ongoing quantitative tightening (QT). Upon further balance sheet reduction, it may transition to a hybrid system. The choice depends on balancing reserve demand uncertainty, financial stability risks, and policy transmission effectiveness. -
Key Takeaways:
- A hybrid framework balances precision in rate control and financial stability.
- Interbank market heterogeneity and liquidity stresses highlight the need to complete banking union reforms.
- Ongoing monitoring is essential to adjust the operational framework as the ECB manages balance sheet reduction and maintains policy effectiveness.
Recommendations:
- Maintain collaborative liquidity assessment mechanisms between banks and the ECB during QT.
- Prioritize completing banking union reforms to mitigate financial fragmentation risks.
- Monitor bank liquidity demands to predict potential shifts from floor to corridor systems.
试读结束,高清完整版pdf/doc/ppt,请点下载