东盟能源数据-连接抱负与行动_马来西亚CCUS之旅(英)-2025.8_31页_3mb
报告摘要
Malaysia's CCUS Journey: Bridging Ambition and Action
Context
Malaysia aims to achieve net-zero emissions by 2050, with CCUS as a cornerstone of its climate strategy. The National Energy Transition Roadmap (NETR) identifies CCUS as a flagship technology to reduce emissions in hard-to-abate sectors, supported by policy frameworks like the National Carbon Capture (NCC) Project and Mission 3: Push for Net Zero under the New Industrial Master Plan 2030.
Policy and Investment Framework
Legal and Regulatory Developments
- 🧾 CCUS Act 2025 (Act 870): Malaysia’s first national CCUS law, enacted in August 2025, establishes a legal framework for carbon capture, transportation, and storage. It focuses on Peninsular Malaysia and excludes Sabah and Sarawak, which have their own regulatory systems.
- 📜 Outlines permits, post-closure stewardship funds, and injection levies.
- 🏛️ Administered by the Malaysia CCUS Agency (MyCCUS), with state autonomy emphasized, particularly for Sabah and Sarawak.
Fiscal Incentives
- 💰 Budget 2023: Introduces tax allowances (e.g., 100% Investment Tax Allowance for CCS equipment) and exemptions (e.g., import duties on CCS-related equipment).
- Target: Attract US$200–250 billion in investments and create 200,000 jobs annually by 2050.
Key Projects
Three Major CCS Initiatives
| Project | Entity | Capacity | Location |
|---|---|---|---|
| Kasawari CCS | PETRONAS | 3.3 Mtpa CO₂/year | Offshore Sarawak |
| Lang Lebah CCS | PTTEP, KUFPEC, etc. | 2028 (target) | Offshore Miri, S. |
| BIGST | JX Nippon, PETRONAS | Not specified | Onshore MALAYSIA |
Pilot Projects
- 📦 Carbon Utilization Projects:
- 🌱 TNB’s Project Bloom (Bio-CCU): Captures CO₂ for algae-based fertilizers and biofuels.
- 🔧 Project Dragon: Captures 5,000 kg CO₂/year at a coal-fired plant.
Regional Role
CCUS Hubs
- By 2030: 3 hubs (2 in Peninsular, 1 in Sarawak) with 15 Mtpa storage capacity.
- By 2050: 6 hubs targeting 40–80 Mtpa capacity.
- Clusters Proposed:
- Northern/Southern Clusters (Peninsular): Industrial CO₂ capture in Kerteh/Bintulu hubs.
- Eastern Cluster (Sarawak): Oil and gas field CO₂ capture at eastern sites.
Challenges and Overcoming Barriers
- Cross-Border CO₂ Transport:
- ⚠️ London Protocol hurdles: Not signed by Malaysia; delays ratification.
- ✅ Solution: Bilateral agreements and regional protocols to align with standards.
- Federal-State Regulatory Harmonization:
- ⚖️ States (Sabah/Sarawak) fear federal overreach on resource management.
- ✅ Framework adjustments under MA63 to protect state jurisdictions.
Conclusion
Malaysia is advancing CCUS through a mix of world-class projects (Kasawari, Lang Lebah), robust legal frameworks (CCUS Act 2025), and fiscal incentives. However, regulatory harmonization across states and cross-border transport protocols remain critical for realizing its Net Zero goals and regional leadership in CCS.
展开完整摘要
试读结束,高清完整版pdf/doc/ppt,请点下载